Lead Time by ZIP Code

To see the anticipated lead time of your order, please enter the order’s ship-to ZIP Code, and click "search."
If a ZIP Code is not found, please refer to the table below. Keep in mind shipping times can vary widely by region.
Lead times by ZIP Code will be available for additional brands soon.

Current Lead Time Status

In the past, our lead time communication was mostly focused production lead times. As indicated in the diagram below, this is the estimated time between order acknowledgement and shipment. These lead time estimates did not include the time to schedule deliveries or the time between the product departing our facilities and reaching the final ship-to address. We will continue to provide you with up to date production lead times, which are estimated with high accuracy.

Additionally, the entire building products industry is impacted by significant fluctuations in demand as well as delays and constraints with freight and cross docks. To better provide you visibility into how these may affect your orders, we are now providing estimated total lead times which are inclusive of the time to schedule home deliveries, production time, and the time to reach the final destination.

cwg_lead_time_ops_status_time_line_NEW3

Actual lead times can vary from the stated lead time in regions where logistical challenges are significant.

Rotate Your Phone Please

For best experience
rotate your device to “landscape” mode,
or view this page on a larger screen
such as tablet or laptop.

Last Updated: May 8, 2024

   BRAND STANDARD
PRODUCTION
LEAD TIME
EXTENDED
PRODUCTION
LEAD TIME
  ESTIMATED
TOTAL
LEAD
TIME
  Advanta – Framed 4 Weeks None   4-5 Weeks
  Advanta – Frameless 4 Weeks +5 Weeks   9-10 Weeks
  Arbor Creek – Framed 4 Weeks None   4-5 Weeks
  Arbor Creek – Frameless 4 Weeks +5 Weeks   9-10 Weeks
  Cedar Springs – Framed 4 Weeks None   4-5 Weeks
  Cedar Springs – Frameless 4 Weeks +5 Weeks   9-10 Weeks
  Design-Craft 4 Weeks +1 Week   6-7 Weeks
  KraftMaid 3 Weeks None   4-6 Weeks
  MasterCraft 3 Weeks +2 Weeks   5-6 Weeks
  Master WoodCraft – Framed 3 Weeks +1 Week   5-6 Weeks  
  Master WoodCraft – Frameless 3 Weeks +2 Weeks   6-7 Weeks  
  Masterpiece 3 Weeks None   4-6 Weeks  
  Medallion Silverline 4 Weeks +1 Week   6-7 Weeks  
  Medallion Gold, Platinum, Bath Silhouettes 4 Weeks +1 Week   6-7 Weeks  
  Merillat Classic – Eastern Region 2 Weeks +1 Weeks   4-5 Weeks  
  Merillat Classic – Central/West Region 2 Weeks +1 Weeks   4-5 Weeks  
  Merillat Basics 2 Weeks None   3-4 Weeks  
  QualityCabinets – Eastern Region 2 Weeks +1 Weeks   4-5 Weeks  
  QualityCabinets – Central/West Region 2 Weeks +1 Weeks   4-5 Weeks  
  QualityCabinets WoodStar 2 Weeks None   3-4 Weeks  
  Serenade 4 Weeks +1 Week   6-7 Weeks  
  Smart 3 Weeks None   3-4 Weeks  
  Yorktowne Classic 4 Weeks +1 Week   6-7 Weeks  
  Yorktowne Iconic, Historic, Bath Sanctuary 4 Weeks +1 Week   6-7 Weeks